An investigation into BIM uptake among contracting firms : an empirical study in Nigeria

Babatunde, S; Perera, S; Ekundayo, DO; Adeleke, D

An investigation into BIM uptake among contracting firms : an empirical study in Nigeria Thumbnail


Authors

S Babatunde

S Perera

DO Ekundayo

D Adeleke



Abstract

Purpose – Building Information Modeling (BIM) is vital in the performance improvement of contracting firms. Thus, there is a need to stimulate its implementation in the construction sector with a view to meeting the competitive demands of the industry. However, there have been very few studies on BIM implementation among contracting firms in Nigeria. Hence, this study examines the current BIM uptake among Nigerian contracting firms, assesses the barriers to BIM implementation, and examines ways of improving BIM implementation within these contracting firms.

Design/methodology/approach – A questionnaire survey was conducted on contracting firms (comprising small, medium and large sized firms) in Lagos, Nigeria. The obtained data were analyzed using both descriptive and inferential statistics. These included percentage, mean score, standard deviation, the Kruskal-Wallis test and factor analysis.

Findings – The study revealed the current state of BIM implementation among contracting firms in Nigeria in terms of their knowledge of BIM, their usage of BIM as well as the BIM software adopted. Furthermore, the study identified 25 barriers to BIM implementation in contracting firms and identified 15 ways to improve BIM implementation in contracting firms. The relative importance of both the identified barriers and the ways for improving BIM implementation was gauged among contracting firms comprising small, medium and large sized firms. The result of the Kruskal-Wallis test revealed that, except for two (out of 25) identified barriers, and one (out of 15) identified ways of improving BIM implementation in contracting firms, there is no significant statistical difference in the perceptions of the three respondents’ groups. The result of the factor analysis categorized the identified 25 barriers into seven main factors.

Practical implications – The study provides empirical evidence on the barriers to BIM implementation and the ways of improving its implementation among contracting firms; thereby providing a better insight of the Nigerian construction industry’s BIM environment.

Originality/value – The study’s findings can positively inform the decisions of construction stakeholders to formulate strategies capable of improving BIM implementation in the construction industry at large.

Citation

Babatunde, S., Perera, S., Ekundayo, D., & Adeleke, D. (2021). An investigation into BIM uptake among contracting firms : an empirical study in Nigeria. Journal of Financial Management of Property and Construction, 26(1), 23-48. https://doi.org/10.1108/JFMPC-06-2019-0054

Journal Article Type Article
Acceptance Date Jul 10, 2020
Online Publication Date Aug 12, 2020
Publication Date Apr 30, 2021
Deposit Date Jul 13, 2020
Publicly Available Date Sep 2, 2020
Journal Journal of Financial Management of property and Construction
Print ISSN 1366-4387
Publisher Emerald
Volume 26
Issue 1
Pages 23-48
DOI https://doi.org/10.1108/JFMPC-06-2019-0054
Publisher URL https://doi.org/10.1108/JFMPC-06-2019-0054
Related Public URLs https://www.emeraldgrouppublishing.com/journal/jfmpc
Additional Information Access Information : This author accepted manuscript is deposited under a Creative Commons Attribution Non-commercial 4.0 International (CC BY-NC) licence. This means that anyone may distribute, adapt, and build upon the work for non-commercial purposes, subject to full attribution. If you wish to use this manuscript for commercial purposes, please contact permissions@emerald.com