M Machado
Implementing BIM to streamline a design, manufacture, and fitting workflow : a case study on a fit-out SME in the UK
Machado, M; Underwood, J; Fleming, AJ
Authors
Prof Jason Underwood J.Underwood@salford.ac.uk
Professor
Mr Andrew Fleming A.J.Fleming@salford.ac.uk
Senior Lecturer
Abstract
This paper presents a case study of BIM implementation for Design for Manufacture and Assembly (DfMA). The project is a Knowledge Transfer Partnership (KTP) between the University of Salford and Links FF&E, a design, manufacture and fit-out SME based in the UK. The project aims to implement BIM as a catalyst for a Lean transformation, streamlining process and operations. Initially, organisational process are reviewed, which is followed by implementing appropriate technologies to enable subsequent people and process transformation. The 30 month project is organized in 6 key stages. This paper presents findings from the first four stages that have been completed to date of 1. Establishing best practice knowledge in BIM; 2. Conducting a review and analysis of the organisation’s current situation, 3. Developing a BIM-based collaborative strategy, and the fourth, which is currently progressing, 4. Pilot implementation of BIM collaborative strategy for DfMA. The remaining stages will conduct a project evaluation, before finally implementing an Enterprise Resource Planning (ERP) system.
Citation
Machado, M., Underwood, J., & Fleming, A. (2016). Implementing BIM to streamline a design, manufacture, and fitting workflow : a case study on a fit-out SME in the UK. International journal of 3-D information modeling (Online), 5(3), 31-46. https://doi.org/10.4018/IJ3DIM.2016070103
Journal Article Type | Article |
---|---|
Acceptance Date | Sep 1, 2016 |
Publication Date | Sep 1, 2016 |
Deposit Date | Jun 7, 2017 |
Publicly Available Date | Jun 15, 2017 |
Journal | International Journal of 3-D Information Modeling |
Print ISSN | 2156-1710 |
Electronic ISSN | 2156-1702 |
Volume | 5 |
Issue | 3 |
Pages | 31-46 |
DOI | https://doi.org/10.4018/IJ3DIM.2016070103 |
Publisher URL | http://dx.doi.org/10.4018/IJ3DIM.2016070103 |
Related Public URLs | http://www.igi-global.com/journal/international-journal-information-modeling-ij3dim/41967#contents http://www.igi-global.com/ |
Additional Information | Projects : KTP - To implement BIM within Links Projects Management LLP ensuring the company has the expertise needed to operate in a BIM environment from design through to refurbishment. |
Files
underwood IJ3DIM 5(3) article.pdf
(1.8 Mb)
PDF
Version
This paper appears in International Journal of 3-D Information Modelling (IJ3DM), authored by Machado, M, Underwood, J, Fleming, A. Copyright 2017, IGI Global, www.igi-global.com. Posted by permission of the publisher.
You might also like
The BIM maturity process to the digital twin for lean strategic facility management
(2023)
Conference Proceeding
Downloadable Citations
About USIR
Administrator e-mail: library-research@salford.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2025
Advanced Search