BA Tezel
Visual management in industrial construction : a case study
Tezel, BA; Koskela, LJ; Tzortzopoulos Fazenda, P
Authors
LJ Koskela
P Tzortzopoulos Fazenda
Abstract
Visual Management (VM) is a distinctive communication strategy that is frequently observed at lean work settings to varying degrees. It relies on the effectiveness of visual communication and catchy visual systems to create visual communication for different managerial purposes. VM in construction has generally been discussed within a building construction context to date.
This paper investigates the VM realization means (visual tools) and attributes in the construction process of a very large industrial facility, which mainly involves
mechanical and electrical construction works. A VM research on the construction site of an industrial facility will help address a gap in the field and extend the understanding of the VM applications in a different construction context other than the building construction/renovation.
The research question of how VM is realized in the industrial construction context was investigated through the case study research method. One of the biggest subcontractors of a very large gas-processing facility was studied in terms of their VM approach and applications. Interviews, site observation and photographic documentation are the main data collection methods. New VM application opportunities in pipe spool fabrication and crane management were identified. Some
industrial construction specific visual systems, VM application attributes for industrial constructions, managerial insights and future application directions were also captured and presented.
Citation
Tezel, B., Koskela, L., & Tzortzopoulos Fazenda, P. (2013, August). Visual management in industrial construction : a case study. Presented at 21th Annual Conference of the International Group for Lean Construction, Fortaleza, Brazil
Presentation Conference Type | Other |
---|---|
Conference Name | 21th Annual Conference of the International Group for Lean Construction |
Conference Location | Fortaleza, Brazil |
Start Date | Aug 31, 2013 |
End Date | Aug 2, 2013 |
Acceptance Date | Mar 19, 2023 |
Publication Date | Jan 1, 2013 |
Deposit Date | Dec 15, 2015 |
Publicly Available Date | Apr 5, 2016 |
Publisher URL | http://iglc.net/Papers/Details/953 |
Additional Information | Access Information : Open Access Event Type : Conference |
Files
Tezel et al. 2013 - Visual Management in Industrial Construction a Case Study (1).pdf
(1.4 Mb)
PDF
Downloadable Citations
About USIR
Administrator e-mail: library-research@salford.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2024
Advanced Search