P Tillmann
Gestao de beneficios na etapa de projecto em empreendimentos hospitalares do reino unido [Managing benefits in the design of healthcare favilities in the UK]
Tillmann, P; Tzortzopoulos, P; Sapountzis, S; Formoso, C
Authors
Abstract
Proposal: The healthcare system in the United kingdomis passing through transformation and change for improvement and innovation. Within this context, healthcare facilities are being developed in a complex multi-stakeholder environment, which usually have diverse and conflicting interests and no experience in design. This contributes for difficulties in managing their requirements, leading to low quality of design. Aiming to contribute for the management of these projects, a benefits management model is being developed and introduced in the sector by the University of Salford. This model intends to support the consideration of different stakeholders’ expectations in project development. In this sense, the aim of this paper was to bring discussions about how such approach could be adopted to support the design process within those projects. This research was developed through the participation on the model implementation, in addition to a literature review on benefits management and design approaches that are used in the UK and that could support benefits management in the design process. Main findings are related to a need for anticipating the participation of designers on project development and straightening the relationship between designers and decision makers. As a result, recommendations could be done to support benefits management throughout the design process.
Keywords: Design process, project management, benefits realisation
Citation
Tillmann, P., Tzortzopoulos, P., Sapountzis, S., & Formoso, C. (2010). Gestao de beneficios na etapa de projecto em empreendimentos hospitalares do reino unido [Managing benefits in the design of healthcare favilities in the UK]. Gestão & Tecnologia de Projetos, 5(1), 109-132. https://doi.org/10.4237/gtp.v5i1.114
Journal Article Type | Article |
---|---|
Publication Date | Jul 1, 2010 |
Deposit Date | Oct 21, 2011 |
Publicly Available Date | Apr 5, 2016 |
Journal | Gestão & Tecnologia de Projetos |
Peer Reviewed | Peer Reviewed |
Volume | 5 |
Issue | 1 |
Pages | 109-132 |
DOI | https://doi.org/10.4237/gtp.v5i1.114 |
Keywords | Design process, project management, benefits realisation |
Publisher URL | http://www.arquitetura.eesc.usp.br |
Files
tillmann_et_all.pdf
(1.5 Mb)
PDF
You might also like
Access to GP services supported by IT infrastructure readiness: Analysing publically available GP practice data
(2013)
Presentation / Conference
A multi-faceted approach to optimising a complex unplanned healthcare system
(2013)
Journal Article
A Case Study On Benefits Realization And Its Contributions For Linking Project Outputs To Outcomes
(2012)
Presentation / Conference
A lean way of design and production for healthcare construction projects
(2011)
Presentation / Conference
Downloadable Citations
About USIR
Administrator e-mail: library-research@salford.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2024
Advanced Search