Future Homes Apr 1, 2023 - Mar 31, 2025
Projects (56)
Future Homes Phase 2 Apr 1, 2025 - Mar 31, 2026
Net Zero terraced street Oct 2, 2023 - Mar 31, 2024
This project will demonstrate how to decarbonise an entire terraced street using a Smart Local Energy System that is integrated with the network, optimised, affordable to consumers and easily replicable across GB.
Heat 3D Stage 2 2022 Nov 1, 2022 - Aug 31, 2024
NEA Contract Research: Energy House 1 Air Source Heat Pump Optimisation Mar 1, 2025 - Apr 30, 2025
Measure the impact of low cost measures intended to improve the performance of air source heat pump installations typical of those in the social housing sector. Findings will be shared with social housing providers, installers, and the general public...
Read More about NEA Contract Research: Energy House 1 Air Source Heat Pump Optimisation.
IPhD with Seddon Ltd Oct 1, 2023 - Sep 30, 2027
Delivering retrofit for heritage buildings
RECONMATIC Jul 1, 2022 - Sep 30, 2026
NEA Energy House 1 Heating System Optimisation Oct 1, 2024 - Dec 31, 2024
Tests will be performed at Energy Hosue 1 for National Energy Action measuring the impact of measures designed to reduce household space heating energy bills. Findings will be published as advice to householders and targeted at those in fuel poverty.
Smart Meter System based Internet of Things (IoT) - Phase 2 Jul 20, 2023 - Mar 31, 2025
Heat Flux Smart Grant Subcontract Dec 1, 2024 - Dec 31, 2025
To achieve the UK Government net-zero ambition requires an 80% reduction in carbon emissions by 2050. Decarbonising domestic buildings is essential, as heating homes accounts for 7% of the UK's total energy demand. Heat-flux sensors measure heat tran...
Read More about Heat Flux Smart Grant Subcontract.
Heat Pump Ready Stream 2 - Total Home Optimisation Management (THOM) Aug 10, 2022 - Feb 10, 2024
The Future Homes Study 2022 Nov 1, 2022 - May 31, 2025
Nusku DESNZ Heat Pump Ready Stream 2 Energy House Testing Apr 27, 2024 - Mar 31, 2025
Test Nusku air source heat pump performance under controlled conditions at the Energy House 1 test facility
Evaluation Of Smart Ventilation Sep 1, 2024 - Jun 30, 2026
Evaluation Of Smart Ventilation System
BEAMA Underfloor 2021 Nov 1, 2021 - Dec 31, 2022
KE with Envirovent Ltd Jun 1, 2021 - Dec 1, 2022
NESTA Literature Review 2022 Jul 1, 2022 - Nov 1, 2022
NESTA Energy House Research Aug 1, 2022 - Jan 1, 2023
Energy House 2.0 Research Fellow (Bellway) Aug 1, 2022 - Aug 31, 2024
Energy House 2.0 Research Fellow (Saint Gobain) Aug 1, 2022 - Aug 31, 2024