Skip to main content

Research Repository

Advanced Search

Optimisation of inspection policy for multi-line production systems

Zahedi-Hosseini, F; Syntetos, AA; Scarf, PA

Optimisation of inspection policy for multi-line production systems Thumbnail


Authors

AA Syntetos

PA Scarf



Abstract

This paper develops a simulation model to determine the cost-optimum inspection policy for a multi-line production system taking account of simultaneous downtime. The machines in the multi-line system are subject to a two stage failure process that is modelled using the delay-time concept. Our study indicates that: consecutive inspection of lines with priority for failure repair is cost-optimal, with a cost reduction of 61% compared to a ‘run-to-failure’ policy; and maintainers need to be responsive to operational requirements. Our ideas are developed in the context of a case study of a plant with three parallel lines, one of which is on cold-standby.
Keywords: maintenance; delay-time model; simulation; production; parallel lines; manufacturing; preventive maintenance.

Citation

Zahedi-Hosseini, F., Syntetos, A., & Scarf, P. (2018). Optimisation of inspection policy for multi-line production systems. European Journal of Industrial Engineering, 12(2), 233. https://doi.org/10.1504/EJIE.2018.090616

Journal Article Type Article
Acceptance Date Dec 14, 2017
Online Publication Date Mar 14, 2018
Publication Date Mar 14, 2018
Deposit Date May 15, 2018
Publicly Available Date Mar 14, 2019
Journal European Journal of Industrial Engineering
Print ISSN 1751-5254
Publisher Inderscience
Volume 12
Issue 2
Pages 233
DOI https://doi.org/10.1504/EJIE.2018.090616
Publisher URL https://doi.org/10.1504/EJIE.2018.090616
Related Public URLs http://www.inderscience.com/jhome.php?jcode=ejie

Files





You might also like



Downloadable Citations