Skip to main content

Research Repository

Advanced Search

All Outputs (343)

Selective entrance of gold nanoparticles into cancer cells (2006)
Journal Article
Krpetic, Z., Porta, F., & Scarì, G. (2006). Selective entrance of gold nanoparticles into cancer cells. Gold Bulletin, 39(2), 66-68. https://doi.org/10.1007/BF03215278

We report that Au(0) nanoparticles, stabilized by 5-aminovaleric acid, selectively penetrate into K562 cancer cells in a short time. These experiments were carried out in order to verify the specific recognition of gold sol by abnormal cells. The obs... Read More about Selective entrance of gold nanoparticles into cancer cells.

A new discrete particle swarm algorithm applied to attribute selection in a bioinformatics data set (2006)
Book Chapter
Correa, E., Freitas, A., & Johnson, C. (2006). A new discrete particle swarm algorithm applied to attribute selection in a bioinformatics data set. In Proceedings of the 8th annual conference on Genetic and evolutionary computation - GECCO '06 (35). ACM Digital Library. https://doi.org/10.1145/1143997.1144003

Many data mining applications involve the task of building a model for predictive classification. The goal of such a model is to classify examples (records or data instances) into classes or categories of the same type. The use of variables (attribut... Read More about A new discrete particle swarm algorithm applied to attribute selection in a bioinformatics data set.

A change management toolkit for construction projects (2006)
Journal Article
Sun, M., Fleming, A., Senaratne, S., Motawa, I., & Yeoh, M. (2006). A change management toolkit for construction projects. Architectural Engineering and Design Management, 2(4), 261-271. https://doi.org/10.1080/17452007.2006.9684621

Changes in construction projects often cause cost and time overruns. Because of the nature of design and construction of buildings, construction professionals often have to make decisions based on assumptions and previous experience. Changes at a lat... Read More about A change management toolkit for construction projects.